News
Main Level is Prepared for Concrete
Oct 02, 2015
Steel joists are aligned and decking is laid over the lower level in preparation for cement.
Conduits and plumbing are covered and leveled as the main floor is prepared for the cement.
Outside, the sidewalk to the side entrance is poured.
Walkway from the parking lot to the building.